Peak catchment discharge with the SCS hydrograph: from DTM to Qmax
The SCS-CN method step by step: catchment from the DTM, CN from land cover, IDF rainfall and the NRCS hydrograph, with a worked example near Tirana.

Every culvert, roadside ditch or bank protection starts with the same question: how much water will arrive here in the design storm? Peak catchment discharge is the number the whole structure is sized for. Underestimate it and water overtops the road and scours the embankment. Overestimate it and you pay for concrete and pipe you never needed.
In practice the slow part is not the formula but the preparation: delineating the catchment in CAD over contour lines, measuring area and flow length, slope, the curve number from soil maps and rainfall from IDF curves. For a small catchment that easily takes half a day. This article walks through the SCS-CN method step by step and solves a real example with numbers, the same one the «Shembull» (Example) button loads in the AlbGIS SCS-CN Hydrograph tool.
Why a hydrograph and not just the rational method
The rational method, Q = C·i·A, gives only the peak and suits small, mostly urban catchments. AlbGIS has a separate tool for it, the Rational Method. A hydrograph gives the whole flow history: when the flow starts to rise, when it peaks and how much water passes in total. You need that volume when you design a detention basin, check a culvert with ponding at the inlet or compare scenarios.
The SCS-CN method, now known as the NRCS method (National Engineering Handbook Part 630, NEH-630), is one of the most widely used for rural and semi-urban catchments. The reason is simple: it links runoff to soil and land cover through a single parameter, the curve number CN.
The four steps of the SCS-CN method
1. The catchment: area, length and slope
The catchment is delineated from the outlet, which is the culvert location. You need three quantities: area A in km², hydraulic length ℓ (the longest flow path to the outlet) in metres and average catchment slope Y in percent. The tool derives them from the 10 m DTM: it fills depressions with the priority-flood algorithm, assigns a D8 flow direction to every cell and collects all cells that drain to the outlet.
2. The curve number CN
CN expresses how much of the rainfall turns into runoff. It depends on land cover and on the hydrologic soil group, from A (sand, gravel, high infiltration) to D (clay or shallow soil over rock). Values come from TR-55 table 2-2. When the catchment has several cover types, CN is area-weighted.
3. Design rainfall and effective rainfall
Rainfall depth P for return period T is taken from IDF curves and distributed in time with the alternating block method, peak in the middle. Runoff, or effective rainfall, follows NEH-630 chapter 10:
Q = (P − Ia)² / (P − Ia + S), where S = 25400/CN − 254 [mm] and Ia = 0.2·S.
Ia is the initial abstraction: water held by vegetation, surface depressions and infiltration before runoff begins.
4. Lag time and the unit hydrograph
Lag time L comes from NEH-630 equation 15-4: L = ℓ^0.8·(S+1)^0.7 / (1900·Y^0.5), with ℓ in feet and S in inches. Time of concentration is Tc = L/0.6. The NRCS dimensionless unit hydrograph peaks at qp = 0.208·A/Tp, in m³/s per 1 mm of runoff, with Tp = Δt/2 + L. The final hydrograph is the convolution of the unit hydrograph with the effective rainfall of each time step Δt.
Worked example: peak catchment discharge of a stream below Mount Dajti
The tool's example is a stream below Mount Dajti, near Tirana, with its outlet close to Lanabregas. The catchment was delineated from the 10 m DTM: 59,779 cells, elevations from 1,611 m down to 219 m. Land cover from CORINE 2018 is mostly broad-leaved forest (72 %), followed by pasture, quarries, olive groves and maquis. The soil group from the map is C across the catchment.
| Parameter | Value |
|---|---|
| Area A | 5.978 km² |
| Hydraulic length ℓ | 5,785 m |
| Average slope Y | 45.7 % |
| Weighted CN (AMC II) | 72.6 |
| S and Ia | 95.9 mm and 19.2 mm |
| Lag L and Tc | 0.62 h and 1.03 h |
| Time step Δt | 5 min |
| Storm duration | 3 h (automatic, ≥ 2·Tc) |
| Rainfall P (T = 50 years) | 101.7 mm |
| Runoff Q | 38.1 mm (coefficient 0.38) |
| Unit hydrograph peak qp | 1.892 m³/s per 1 mm |
| Peak discharge Qmax | 42.52 m³/s |
| Time to peak | 2.25 h from the start of rainfall |
| Runoff volume | 228,000 m³ |
Hand check of runoff: P − Ia = 101.7 − 19.2 = 82.5 mm, so Q = 82.5² / (82.5 + 95.9) = 38.1 mm. Rainfall is interpolated at the outlet from the three nearest stations with 1/d² weights: Tirana City (5.6 km, weight 87 %), Tirana Airport (16 km) and Elbasan (30 km).
How much the designer's choices matter
With the same catchment, a few choices move Qmax considerably:
| Scenario | Qmax (m³/s) |
|---|---|
| T = 10 years | 18.67 |
| T = 50 years (base) | 42.52 |
| T = 100 years | 54.43 |
| Soil group D everywhere (CN 79.1) | 65.06 |
| λ = 0.05 instead of 0.20 (Hawkins et al., 2002) | 54.77 |
The soil group has the largest effect. The SoilGrids map (250 m) comes out mostly C because it does not know how thick the soil is over bedrock. For mountain catchments with shallow soil, D is the safer choice. For sandy alluvium, B.
Checks before you use Qmax
- Time step: Δt ≤ 0.29·Tp (NEH-630, ch. 16). In the example 5 min ≤ 11.4 min.
- Time of concentration: compare Tc with the Kirpich formula. Here 1.03 h against 0.44 h. The ratio of 2.3 is still within the tool's guidance range (0.4 to 2.5), but it shows that on steep catchments the two methods give quite different times.
- Storm duration: at least 2·Tc, otherwise the peak is underestimated.
- Catchment size: the synthetic unit hydrograph is used up to about 2,000 km². Larger catchments are split into sub-catchments.
- Areal reduction: rainfall is taken at the outlet without areal reduction, so for catchments above about 25 km² the result is on the safe side.
The result is meant for concept and preliminary design. For detailed design, verify it with a hydrological study and a topographic survey.
How to do it with AlbGIS
- Open albgis.com/hidrogrami. To see a result straight away, press «Shembull» (Example): the catchment above loads.
- Step «Pellgu» (Catchment): click the outlet on the map or type WGS84 coordinates. Automatic delineation needs a free AlbGIS account, because the DTM is served with a daily limit. Without an account, tick «Vlerat e pellgut me dorë» (catchment values by hand) and enter A, ℓ and Y.
- Step «Mbulesa & CN» (Land cover & CN): check the CN table. Take the soil group from the map or choose it yourself (A to D). You can also enter CN directly.
- Step «Shiu» (Rainfall): choose the return period (2 to 100 years), the duration (automatic or 1 to 24 hours) and λ.
- Step «Hidrogrami» (Hydrograph): read Qmax, time to peak, runoff and volume.
- «Dalja» (Output) tab: export the hydrograph as CSV and the catchment boundary as GeoJSON. The «Raport PDF», a technical note with the catchment map, CN table, rainfall, hydrograph and methodology, is part of the Premium plan (€9/month).
With Qmax in hand, move on to Culverts or Open Channels to size the structure. If your outlet point comes from a handheld GPS, see how to convert GPS coordinates to KRGJSH-2010. For stormwater in towns, read why urban flooding is not a natural disaster.
Frequently asked questions
What is the SCS curve number?
It is a number from 30 to 100 that summarises how much water the ground absorbs and how much runs off. A high CN (asphalt, clay) means more runoff; a low CN (forest on sandy soil) means less. It depends on land cover, hydrologic soil group and antecedent moisture.
When should I use the SCS method instead of the rational method?
The rational method gives only the peak and suits small, mostly urban catchments. The SCS method gives the full hydrograph, including volume and time to peak, and fits rural and mountain catchments up to a few hundred km² better.
How is the time of concentration calculated?
In the NRCS method Tc = L/0.6, where the lag L depends on hydraulic length, CN and average catchment slope. It is worth comparing it with another formula such as Kirpich, because on steep catchments the results differ.
Try it free in the SCS-CN Hydrograph tool: load the example, then place your own outlet. For complete hydrological studies with survey, structure sizing and a report for permitting, the Decagon team is ready: write to us and start a project.
A step-by-step video will be published soon on the Decagon YouTube channel.
Read also

Gravity sewers: from population to pipe diameter
The largest pipe is not always the answer. Why minimum velocity matters as much as capacity, and how both are…

Urban stormwater: why urban flooding is not a natural disaster
Every square metre of paving turns water that used to soak in into surface runoff. How a stormwater network is…

How to Design a Water Supply Network That Holds Pressure
A large diameter does not mean a good network. How flow, pressure and losses relate to each other, and why…
Have a project in mind?
Many of these articles started as client questions. Send us yours.